Design Requirements

In order to develop a site specific designed solution for your project the following information would be required:

  • All site investigation data, including historical investigations to enable us to undertake a comprehensive review and desk study.

  • All gas monitoring and groundwater monitoring information including all historical monitoring information.

  • Detailed site survey, with a preference for .dwg format to enable us to draw our proposals using CAD.

  • All details of services, drainage or any other manmade structures that exist on or beneath the site.

  • Any other relevant information, anecdotal or otherwise that may affect or influence our proposals.

  • A copy of the part 2A determination document.